Central & South Huron Secondary School Renovation
Company Name
JMR Electric Ltd.
Timeline
Sep 2021 - July 2022
Location
Exeter, Ontario
About Project
Client: Avon Maitland District School Board
General Contractor: JMR Electric Ltd.
Architect: DMDS Design Services
Consultant: DMDS Ltd.
My Role: Mechanical and Electrical scope installation and coordination
Project Scope
Mechanical and Electrical upgrades to second floor of an active secondary school facility
Scope of work included:
Removal and replacement of outdated HVAC units, ductwork, including Roofing and flooring.
Installation of new energy-efficient fan coil units and ducted ventilation systems
Upgrades to piping systems (domestic hot water, chilled water, condensate drainage)
Fire protection modifications as needed for ceiling layout changes
Coordination with electrical upgrades (control wiring, disconnects)
System testing, commissioning, and integration with school’s BMS
Project Considerations
Work performed in an operational school environment with strict safety, noise, and scheduling controls
Weekend and after-hours work required for disruptive mechanical tie-ins
Coordination with ceiling grid changes and classroom renovations
Timeline
Project Duration: 10 months
Substantial Completion: July 2022
Project Budget
$1.1 M
Project type
Municipal Project - Institutional
As part of J.M.R. Electric Ltd., I worked as a General Contractor on the mechanical upgrades for Central Huron Secondary School’s second floor. The project focused on modernizing HVAC systems and integrating energy-efficient fan coils, all within a live school environment. My role included mechanical installations, BMS and BAS coordination, and assisting with phased execution to minimize disruption during the academic calendar.