Central & South Huron Secondary School Renovation

Company Name

JMR Electric Ltd.

Timeline

Sep 2021 - July 2022

Location

Exeter, Ontario

About Project


Client: Avon Maitland District School Board
General Contractor: JMR Electric Ltd.
Architect: DMDS Design Services
Consultant: DMDS Ltd.
My Role: Mechanical and Electrical scope installation and coordination

Project Scope

Mechanical and Electrical upgrades to second floor of an active secondary school facility

Scope of work included:
Removal and replacement of outdated HVAC units, ductwork, including Roofing and flooring.
Installation of new energy-efficient fan coil units and ducted ventilation systems
Upgrades to piping systems (domestic hot water, chilled water, condensate drainage)
Fire protection modifications as needed for ceiling layout changes
Coordination with electrical upgrades (control wiring, disconnects)
System testing, commissioning, and integration with school’s BMS

Project Considerations

Work performed in an operational school environment with strict safety, noise, and scheduling controls
Weekend and after-hours work required for disruptive mechanical tie-ins
Coordination with ceiling grid changes and classroom renovations

Timeline

Project Duration: 10 months
Substantial Completion: July 2022

Project Budget

$1.1 M

Project type

Municipal Project - Institutional

As part of J.M.R. Electric Ltd., I worked as a General Contractor on the mechanical upgrades for Central Huron Secondary School’s second floor. The project focused on modernizing HVAC systems and integrating energy-efficient fan coils, all within a live school environment. My role included mechanical installations, BMS and BAS coordination, and assisting with phased execution to minimize disruption during the academic calendar.